Marquee Installation in Chiapas, Mexico
Installation and manufacture of a 20 x 35m marquee in a hotel in Chiapas. Designed with a gabled roof on one side and a hipped roof on the other, this marquee serves as an event hall for the Hotel – Parador San Juan de Dios. The project also consists of 3 passages that connect the main marquee with the bathrooms, hotel and an additional marquee (10 x 13m) that serves as a bar and ‘Chill Out’ zone.








